Coating of concrete ret. pit and steel tanks - DIAMO, Dolní Rožínka

Coating of the concrete wastewater retaining pit and technological steel tanks at the uranium ore treatment plant was made using the technology of sprayed polyurea GME system. 

Total of  225 m2 of concrete retaining pit and 400 m2 of the steel tanks were coated. The technology of coating included sand blasting of the surface, application of primer layer and final spray of polyurea GME.

       